25 CABOT SQUARE

25 CABOT SQUARE 2020-08-13T09:48:22+01:00

Project Description

Liftec modernisation at Canary Wharf

25 CABOT SQUARE MORGAN STANLEY

Keeping up to date in one of Europe’s premium commercial centres is essential for businesses operating in such high profile locations. Exactly the case for Morgan Stanley who had decided the time was right to modernise the 18 existing high specification lifts located at 25 Cabot Square, Canary Wharf, London.

The project was for the building’s high speed passenger lifts, fireman’s lifts and goods lifts requiring new control systems and drives, and the work required to bring the lift cars up to the current DDA and Health & Safety standards.

Liftec were successful in winning the tender for the lift modernisation works at this prestigious Canary Wharf site which utilised our specialist design skills, manufacturing and construction resourcing. Additionally, competent Liftec project management ensured satisfactory works were undertaken on a phased basis to limit disruption whilst working in the fully operating building.

DOWNLOAD PDF